00-copy-2

Multipurpose Sport Complex Buildings, Kish, Iran

  • South Gate of Football Training Camp
  • Administration Building and Football Academy
  • Match Field Grandstands
  • Multifunctional/ Centeral Gym Building
  • Locker Room and Gym for Football Training Pitches
  • Recretional area
  • Aqua Center
  • Track & Field camp
  • Ball Indoor stadium
  • Matt Indoor stadium
  • Bicycle Club
  • Racuqet Sports
  • Residential 2
  • Residential 1
  • Shopping Mall
  • Entrance Retails
  • Management Building
  • Greenhouse
  • Beach complex

Client:
Tehran Renovation and building Co. NOSA
Location:
Kish
Contract Start up:
2018
Total Area:
318107 Square Meters
Project Type:
Architectural Design and Supervising
Landuse:
Multipurpose Sport Complex

WhatsApp-Image-2020-11-30-at-23.16.38

3D Panel Ardestani Project

Design, Construction,

Location: Ardestani Street, District 22, Tehran, Iran

Contract Start up: 2019

Contract Start up: 2022

Execution period of the project: 36 months

 

20170116-110735-Copy

9-storey Hamedan residential building

Design, Supervising, Construction

Location: 9 Zamani St., Pasdaran Blvd., Hamedan, Iran

Contract Start up: 2018

Contract Start up: 2021

Execution period of the project: 36 months

2-4

Damavand Villa, Damavand, Iran

  • Client:

    Mr. Mir

  • Location:

    Damavand

  • Start Date:

    2015

  • Project Type:

    Architectural Design, Interior Design & Supervising

  • Landuse:

    Residential

001-7

Steel Building Sepidan 21 St.

Implementation of a steel building in Shamshak district

Location: No. 21 Sepidestan Street, Shemshak District, Tehran Province, Iran

Contract Start up: 2013

Contract End: 2017

Employer: A.S.P

Structure weight : 400 tons

Execution period of the project: 48 months

erfan1_2000-1400x786

24-storey tower of Erfan residential complex

Implementation of a 24-story tower in Tehran’s 22nd district

Location: 22nd district, Tehran Province, Iran

Contract Start up: 2012

Contract Start up: 2017

Structure weight : 4500 tons

Execution period of the project: 60 months

02-1-scaled

Golsar(Syna) Office and Commercial Complex, Rasht, Iran

Saina Commercial Office Complex has been planned and designed as an investment project by Saina Company on behalf of Mizan Bank. Due to the special location of the project near Golsar Boulevard and as one of the most important streets of Rasht, unique features have been considered for its planning and design.

A commercial multi-functional complex, the required multi-level car park (which is located on the upper floors due to the groundwater situation of Rasht) .And after that tower for office units. Due to the limitations of landscaping and the need to create green space for the project from the roof of the parking section upwards and in combination with office floors, spaces have been designed as stepped terraces to create vegetation.

  • Client

    Saina Company

  • Location

    St.Golsaar, Rasht

  • Contract Start up

    2013

  • Total Area

    12111 Square Meters

  • Project Type

    Architectural Design and Interior Design & Supervising

  • Land-use

    Commercial-Office Building

renders-05-scaled

Golestan Residential Building, Tehran, Iran

Golestan Residential Complex, with a foundation area of 9096 square meters, has 4 floors under the ground and 8 floors above the ground. It was designed in Aqdasiyeh area, which is one of the best residential areas in Tehran. This building consists of 15 luxurious residential units built on 9 floors and 30 parking units built on 3 floors and includes entertainment/athletic facilities, watchman residency, and an exquisite lobby. In addition, the roof of the building has been designed in a different and delicate manner.

The first, second, fifth, and sixth floors are all single-unit floors.  On the third and fourth floors, every half has been connected to another on the floor above and has created two-story units in a way that the upper level is fully equipped and complete on its own. The eastern parts of the 7th and 8th floors are also connected together and have created a luxurious two-story unit.

Moreover, a green roof has been designed, which in addition to its function as a yard, contributes to the adjustment and balance of environmental conditions through providing the possibility of considerable plant growth and also operates as a cooling system. It also reduces the effects of heat islands and causes the absorption of water resulting from any kind of precipitation

The design of Golestan Residential Complex, with its emphasis on the principles of sustainable development, is a modern approach in accordance with environmental concerns. The philosophy of sustainability is at the core of this design project and not only has it opened to the door to efficient management of resources and their return to the cycle of life, it has also provided a suitable space for the coexistence of individuals with their own idiosyncratic needs.

The building, with its plant-covered fabric, has contributed to the conservation of green spaces in the environment and has also maintained a standard of air circulation in the northern and southern section through the creation of splits in volume, staircases, gardens, open and green spaces throughout the floors; in these conditions, temperature exchange throughout the seasons is also done more appropriately.

  • Client:

    Setareh Omran Zamin Co.

  • Location:

    Movahed Danesh St. Aghdasiyeh St. Tehran

  • Contract Commencement Date:

    2011

  • Total Area

    9287.5 Square Meters

  • Project Type:

    Architectural Design

  • Landuse:

    Residential

4-3

Pajoohesh Street Excavation project

Excavation project in the Pajoohesh Street

Stabilization operation of excavation of Pajoohesh Street project to a depth of 18 meters using nailing and anchoring system.

Contract Start up: 2014

Contract End: 2015

Employer: K.G.T

Excavation Depth : 18 m

Execution period of the project: 12 months