Pajoohesh Street Excavation project

Project Info

  • Category

    Construction

  • Pajoohesh Street

    Excavation Depth : 18 m

Excavation project in the Pajoohesh Street

Stabilization operation of excavation of Pajoohesh Street project to a depth of 18 meters using nailing and anchoring system.

Contract Start up: 2014

Contract End: 2015

Employer: K.G.T

Excavation Depth : 18 m

Execution period of the project: 12 months