Pajoohesh Street Excavation project
Excavation project in the Pajoohesh Street
Stabilization operation of excavation of Pajoohesh Street project to a depth of 18 meters using nailing and anchoring system.
Contract Start up: 2014
Contract End: 2015
Employer: K.G.T
Excavation Depth : 18 m
Execution period of the project: 12 months
Excavation project in the Pajoohesh Street
Stabilization operation of excavation of Pajoohesh Street project to a depth of 18 meters using nailing and anchoring system.
Contract Start up: 2014
Contract End: 2015
Employer: K.G.T
Excavation Depth : 18 m
Execution period of the project: 12 months